|
| |||||||||
|
| |||||||||
Projects |
City Link had grown out of their office space, their
network was fragmented and unwieldy. |
Callow & Maddox had a system that had grown
and after several office moves, |
Dennis Eagle has had several external contractors
installing various sections of their network over a period of time.
Installation practice i.e. termination and testing was not of a high
standard. |
Eagle Ottawa had an old poorly installed category 3/5 cabling system. Originally installed over seven years previously, it had been expanded beyond its original parameters. |
|
Tel : 024 767 13074 Mobile : 07974733095 Email : info@dbcabling.co.uk |